喷泉工程最新的验收规范

  喷泉工程极速时时彩是现在景观工程里非常具有代表性的网红项目。那么在喷泉工程制作完成之后验收的过程中需要注意哪些方面呢?今天专业音乐喷泉厂家的朱工整理了一些最新的工程验收的时候需要注意的规范供大家参考。

极速时时彩  music fountain project is a very representative net red project in landscape engineering. so what aspects should we pay attention to in the process of acceptance after the completion of the fountain project? today, zhu gong, a professional music fountain manufacturer, has sorted out some specifications that need attention when accepting and accepting projects for your reference.

极速时时彩  diyi,yinlepenquangongchengchidixiadeshuibengshifouanzhuanglaogu,zheigeshejidaohouqishuibengdeshiyongshouming。

极速时时彩  dier,gongchengchidibiaomiandeshuiguanshifouhanjielaogu,fangzhiloushui,houqizhichengpenquanwendingdeshuiya。

  disan,anzhaohezuozhiqiandeshangliangxijiequyiyiduiyingjianchashifoudadaoyueding。

  disi,jianchajishuishushuixitongdeguanjianshifouwanzhengqiebuloushui。

喷泉工程完工效果图.jpg

  firstly, whether the pump under the pool of the music fountain project is firmly installed involves the service life of the pump in the later period.

极速时时彩  secondly, whether the water pipes on the bottom surface of the engineering pool are soldered firmly to prevent leakage and support the stable water pressure of the fountain in the later stage.

  thirdly, check whether the agreement has been reached according to the detailed business area before the cooperation.

极速时时彩  fourthly, check whether the fittings of the water supply and transportation system are complete and not leaking.

极速时时彩  penquangongchengdeanzhuangguifan:

  penquangongchengdezhuyaogongyiliucheng:

  diyi: yuzhijijiagongzhuyaogongyiliucheng a、yuzhiguandao: fangyanghuaxian→qiegexialiao→gangguanbianqu→zhuguandakong→liguantaosi→bengkoujiagong→hanjieliguan→hanjiefalan→yiciqingxi→erciduxin→ yunwangshigongxianchang。 b、pentoujiagong: rongtong→zhuzao→chechuangchexue→paoguangchuli→fangfuchuli→ hegeruku。 c、kongzhishebei: yuanjianjiance→xianlubanhanjie→zhengbandiaoshi→zujiananzhuang→ zhengjidiaoshi→laohuashiyan→hegeruku。 d、peidianshebei: jixiangjiagong→dianqishebeianzhuangyulianxian→hegechuchang。

  installation specification for fountain engineering:

  main technological process of fountain engineering:

极速时时彩  first: prefabrication and processing of the main process a, prefabricated pipelines: laying out lines cutting and cutting materials pipe bending main perforation riser sleeve pump mouth processing welding riser welding flange one cleaning secondary galvanizing shipment to the construction site. b. sprinkler processing: molten copper casting lathe turning polishing anticorrosion qualified storage. c. control equipment: component testing circuit board welding whole board debugging assembly installation whole machine debugging aging test qualified storage. d. distribution equipment: case processing electrical equipment installation and connection qualified factory.

极速时时彩  anzhaozuixindepenquangongchengxitongyaoqiudiaoshiqianxuyaozuoruxiazhunbei

极速时时彩  1、qingjieshuichi,bingjiangshuichizhushuizhizhengchangshuiwei;

  2、qingsaojifangshineiweishengjiqingjieshebeiwaiqiaoheju(xiang)neizawu;

极速时时彩  3、duidianqishebeijinxingganzaochuli;

  4、jianchaxitongliuchenganzhuangshifouwanquanzhengque;

  5、duidianqishebeijinxingdanjishiyunxing。

  preparations for commissioning of fountain engineering system

极速时时彩  1. clean the pool and inject the water into the normal water level.

  2. cleaning the housings and cabinets of indoor sanitation and cleaning equipment in the machine room;

  3. drying electrical equipment;

  4. check whether the system process installation is correct.

  5. single-machine test run of electrical equipment.

极速时时彩  penquangongchengdezongtianzhuangshigongchengxuyouyupenquanshebeideanzhuangxuzaishigongxianchangjinxing,qieweilutianzuoye,suoyiduiguandao、dianqi、shuixiadengdengfanyoutiaojianjunyingcaiqutiqianyuzhijiagongdefangfa,zheishiquebaogongchengjinduhegongchengzhiliangdeguanjian。

喷泉工程完工效果.jpg

  because the installation of fountain equipment needs to be carried out on the construction site and is open-air operation, the pre-fabrication of pipelines, electrical and underwater lamps should be adopted in advance when conditions permit, which is the key to ensure the progress of the project and the quality of the project.

  duiyuzhenggepenquangongchenglaishuojianyandeguifanshizuihouyidaozhiliangdefangxian。henduodezhiliangyinhuandoushizaiyanshoudanweimeiyouanzhaojianyandeguifanqucaozuoerzaochengde。zheigeshihoujisushishicaijiuxuyaodingjingongchengdemeigehuanjie,shenhuajianchayanshouzhidu。haodegongchengyidingjingdeqigaobianzhundeyaoqiu。ruguoanzhaorushangzuixindeyanshouguifanxiangxingongchengdepinzhihuidedaogaobiaozhundebaozhang。

极速时时彩  for the whole fountain project, the standard of inspection is the last line of defense for quality. many hidden quality hazards are caused by the failure of acceptance units to operate in accordance with the inspection norms. at this time, we need to focus on every link of the project and deepen the inspection and acceptance system. a good project must stand up to the requirements of high accuracy.


配图
联系极速时时彩

联系人: 杨经理
电话:

座机:

youxiang:

dizhi: zhejiangshenghangzhoushiyuhangquxianlinzhenqianjialing8hao

微信二维码

weixinerweima

极速时时彩,极速时时彩官网|【官网】 秒速飞艇_秒速飞艇彩票-欢迎您 秒速赛车_秒速赛车开户|【官网】 时时彩_时时彩欢彩网_最佳信誉官网 香港赛马_香港赛马官网-欢迎您 五分赛车_五分赛车开奖官网-点击进入>! 上海时时乐_上海时时乐下注_主页 幸运赛车_幸运赛车软件下载_【官网推荐】 十分时时彩_十分时时彩官方网站【官方网站】 德国飞艇_哪里可以买德国飞艇-专业购彩APP 秒速飞艇_秒速飞艇投注>> 首页