喷泉工程设备安装流程简介

  penquangongchenggongsishebeideanzhuangshipenquangongchengdiaoshiyingyongqiandezuihouyigezhongyaoguocheng,zhenggeanzhuangguochengshianliuchengzoude。

  (1)、shebeianzhuangqian,yingyimeipi(tongpaihao、tongguige 、tongxinghao)shuliangzhongchoucha10%.ruyoulouliebuhegede,yingzaichoucha20%,rurengyoubuhegedezexuzhugeshiyan。qiangduheyanmixingshiyanyaliyingweifamenchuchangguidingzhiyali。bingzuohaofamenshiyanjilu。

极速时时彩  (2)、famenanzhuangshi,yingzixiheduifajiandexinghaoyuguigeshifoufuheshejiyaoqiu。fatishangbiaoshijiantou,yingyujiezhiliudongfangxiangyizhi。

  (3)、jingguanpenquanpenzuianzhuang,weizhiyingfuheshejiyaoqiu,bianyucaozuo。

极速时时彩  (4)、guandaoshiyachuixi: guandaoshiyaanxitongfenduanjin ,jiyaomanzuguifanyaoqiu,youyaokaolvguancaihefajianyingaochengjingyazengjiadechengshounengli。shuiyaqiangdushiyandeceshidianshezaiguanwangdezuididian。duiguanwangzhushuishi,yingxianjiangguanwangneidekongqipaijing,binghuanhuanshengya,dadaoshiyanyalihou,wenya30fenzhong,muceguanwang,yingwuxielouhewubianxing,qieyalijiangbuyingdayu0.05mpa.

  penquandianlanfushe

  (1)、dianlanfusheqianyingduidianlanjinxingxiangxijiancha,guige、xinghao、jiemiandianyadengjijunyaofuheshejiyaoqiu,waiguanwuniuqu、huaisunxianxiang。bingjinxingjueyuanyaocehuonaiyashiyan。

极速时时彩  (2)、dianlanpanxuanzeshi,yingkaolvshijizhangdushifouyufushezhangduxiangfu,binghuizhidianlanpailietu,jianshaodianlanjiaocha。

  (3)、fushedianlanshi,anxiandahouxiao、xianzhanghouduandeyuanzejinxing,pailiezaidicengdexianfushe

  (4)、biaozhipaiguigeyingyizhi,bingyoufangfuxingneng

  (5)、kaiguanxiangdengdiyadianqianzhuang: kaiguanxiangdengdeanzhuangxugewaizhuyiguanganzhiliang、biaogaoweizhiyaozhengquekekao。

The installation of fountain company equipment is the last important process before the application of fountain engineering debugging. The whole installation process is carried out according to the process.
(1) Before installation of the equipment, 10% of the quantity of each batch (same brand, same specification, same model) should be sampled. If there are leaks and cracks that are not up to standard, 20% should be sampled again. If there are still unqualified, one test should be conducted. Strength and tightness test pressure shall be the required pressure for the valve to be discharged from the factory. Record the valve test.
(2) When the valve is installed, the type and specification of the valve should be carefully checked to meet the design requirements. The arrow should be marked on the valve body in accordance with the direction of medium flow.
(3) Landscape fountain nozzle installation, location should meet the design requirements, easy to operate.
(4) Pipeline pressure test blow-washing: Pipeline pressure test is carried out in stages according to the system, which not only meets the requirements of specifications, but also considers the bearing capacity of pipes and valves due to the increase of elevation static pressure. The test point of hydraulic strength test is set at the lowest point in the pipeline network. When water is injected into the pipeline network, the air in the pipeline network should be cleaned first, and the pressure should be increased slowly. After reaching the test pressure, the pressure should be stabilized for 30 minutes, and the visual pipeline network should be leak-free and deformation-free, and the pressure drop should not be greater than 0.05 Mpa.
Fountain Cable Laying
(1) Cables should be inspected in detail before laying. Specifications, models and voltage levels of cross-section should meet the design requirements, and the appearance should not be distorted or damaged. The insulation rocking test or voltage withstanding test were carried out.
(2) When choosing the cable disc, we should consider whether the actual length is consistent with the laying length, and draw the cable arrangement chart to reduce the crossing of cables.
(3) When laying cables, they should be laid first in accordance with the principle of "big first, small first, long first and short second", and arranged at the bottom of the cables.
(4) The specifications of the signs shall be the same, and the signs shall have anticorrosive properties.
极速时时彩(5) Installation of low-voltage electrical appliances such as switchboxes: The installation of switchboxes should pay special attention to the visual quality and the correct and reliable elevation position. 

20095423.jpg

   2016年10月15日
 

 

配图
联系极速时时彩

联系人: 杨经理
电话:

座机:

youxiang:

dizhi: zhejiangshenghangzhoushiyuhangquxianlinzhenqianjialing8hao

微信二维码

weixinerweima

极速时时彩,极速时时彩官网|【官网】 秒速飞艇_秒速飞艇彩票-欢迎您 秒速赛车_秒速赛车开户|【官网】 时时彩_时时彩欢彩网_最佳信誉官网 香港赛马_香港赛马官网-欢迎您 五分赛车_五分赛车开奖官网-点击进入>! 上海时时乐_上海时时乐下注_主页 幸运赛车_幸运赛车软件下载_【官网推荐】 十分时时彩_十分时时彩官方网站【官方网站】 德国飞艇_哪里可以买德国飞艇-专业购彩APP 秒速飞艇_秒速飞艇投注>> 首页